Remote Control A3 A4 European Overhead Crane Single Beam type
Contact Person : Iris
Phone Number : +86 19939938244
WhatsApp : +8619939938244
Minimum Order Quantity : | 1 set | Price : | USD8000-USD40000 |
---|---|---|---|
Packaging Details : | High quality standard exported plywood crate | Delivery Time : | 15-20 days |
Payment Terms : | Western Union, L/C, T/T | Supply Ability : | 300 sets/per month |
Place of Origin: | China | Brand Name: | Silence |
---|---|---|---|
Certification: | ISO CE | Model Number: | LHO |
Detail Information |
|||
Warranty: | 2 Years | Type: | QDO Model |
---|---|---|---|
Traveling Speed: | 20/5m/min | Max. Lifting Height: | 30m |
Certification: | CE GOST ISO SGS | Feature: | Bridge Crane |
High Light: | 7m Euro Double Girder Overhead Crane,150 Ton Euro Double Girder Overhead Crane,7m 150 Ton double girder eot crane |
Product Description
Description of Euro Double girder overhead crane
1.High Performance Industrial European Type Double Girder Overhead Crane 30 Ton With Hoist are mainly consists of Girder frame, Crane travelling device, hoist as the lifting device and electrical parts, it is designed with working grade of A5~A8 according to the use frequency.
2. It is rely on the bridge frame along the workshop rail direction moves forward-backward, the hoisting mechanism can be hoist type or winch type according to the lifting capacity and working demand. The trolley along the main beam direction moves left-right and the hook lift up-down.
High Performance Industrial European Type Double Girder Overhead Crane 30 Ton With Hoist is widely used in workshop, warehouse, etc. Its outstanding advantage is light weight design, modular design, advanced manufacturing technology, high security, high reliability, low-energy & free-maintenance and Intelligent.
Technical parameter of Euro Double girder overhead crane
Capacity | T | 10/32 | ||||||
Total weight | kg | 12530 | 14660 | 16360 | 18870 | 21650 | 24260 | 27060 |
Max. Wheel load | KN | 167 | 184 | 196 | 206 | 215 | 224 | 233 |
Rail recommended | Model | 43kg/m | ||||||
Total motor power | kw | 20 | ||||||
Main dimension (mm) | Span(m) | 7.5 | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 |
Rail top to crane top | H | 1900 | ||||||
Rail top to hook center | H4 | -700 | ||||||
Crane base distance | W | 1600-2500 | ||||||
Crane width | B | 5070-5960 | 5572-6222 | |||||
Trolley rail distance | K | 1600-2550 | ||||||
Hook left limitation | S1 | 1100 | ||||||
Hook right limitation | S2 | 1600 |
Features of Euro Double girder overhead crane
Appearance paint
To prevent corrosion during manufacturing process, pretreatment on the plate - sandblasting rust (rust grade Sa2.5 level, the degree of roughness EZ40-80 micron) and spraying epoxy zinc-rich primer pre-production, effective prevent corrosion during manufacturing process. After welding inspection, the whole crane will be painted with two primer coat, one middle paint, two finishing coat, the total thickness of the paint film to reach 75 ~ 140μm.
Safety protection system
Main and auxiliary lifting mechanism of the crane are both equipped with overload limiter. When the load reaches 90% of rated load, issued of suggestive alarm signal; when lifting weight reaches more than 105% of rated load, it will automatically and immediately cut off the lifting power source, and issued prohibitory alarm signal. Crane main equipped with analog tonnage display instrument.
According to crane mechanical safety rules, each exposed wounding dangerous rotating parts have to be set up with shields, and wire rope anti-pumping device. Shield in the form of detachable safety cover.
Platforms, walkways and ladders set up to facilitate the operator's maintenance and inspection. Ladders step, outdoor platform and walkway should be skip resistance, walkway, platform and ladder width not less than 500mm, walkway using tread plate.
Crane installed with lifting height limiter and traveling stroke limiter, through electric control to achieve security protection for traveling stroke and locations.
Install cushioning device on crane to buffer crane operation braking kinetic inertia. While installed stop devices on the limit position of each crane operating mechanism to prevent the risk when crane runs exceeds the limit position.
Install rail sweep on crane to clean up debris on the rail, to prevent dangerous such as derailment caused by debris on the track. Rail sweep board is 10mm away from the track surface.
Set electrical interlock protection system in the crane railing door, cut off the supply power of which mechanism movement is dangerous for personnel.
European Double Girder Overhead Crane electrical part installed with phase lack protection, wrong phase protection, low-voltage and overvoltage protection, short circuit protection, overcurrent protection, overload protection, ground fault protection and other electrical protection, sound and light alarm, to ensure crane operation under stable and safe conditions.
Package and delivery
Enter Your Message