Contact Us

Contact Person : Iris

Phone Number : +86 19939938244

WhatsApp : +8619939938244

Free call

Port Height 15M 7.5 Ton Single Girder Gantry Crane

Minimum Order Quantity : 1 set Price : USD15000-50000/set
Packaging Details : Electrical, hoist and other parts packed by high quality plywood crate; Beams packed by rain proof plastic cloth Delivery Time : 40 days
Payment Terms : L/C, T/T, Western Union Supply Ability : 2 sets/per month
Place of Origin: CHINA Brand Name: Silence
Certification: ISO CE Model Number: MH

Detail Information

Lifting Speed: 0~8m/min After-sales Service Provided: Video Technical Support, Online Support
Lifting Mechanism: Electric Hoist Main Electrical Parts: CHINT,SIMENS
Crane Feature: Steel Box Type Power Source: 3 Phase 380V 50hz,3phase Or Others
High Light:

7.5 Ton Single Girder Gantry Crane

,

Height 15M Single Girder Gantry Crane

,

Height 15M heavy duty gantry crane

Product Description

Provide Video Technical Support 7.5 Ton Single Girder Gantry Crane Height 15M

 

Product presentation of Single girder gantry crane

 

MH - electric hoist gantry crane -MH - electric hoist gantry crane this machine is used with CD1, MD1 electric hoist, suitable for open work between the fixed span, the machine is prohibited to lift inflammable and explosive goods, according to the requirements of users can also be made into a single end overhanging cantilever type or no cantilever type structure.


Electric hoist CD1 and MD1 type two, the main beam is i-steel and steel composite beam, the car running mechanism is mainly composed of motor, brake, reducer, wheel, etc., its structure is simple, installation, use, easy maintenance.This machine is suitable for factories, railway freight yards, ports, docks, hydropower stations and other places: the working class of this machine is A5, and the operation mode is ground and room operation. It is optional for users to choose.

 

 


Technical parameters of Single girder gantry crane

 

Lifting capacity T 3 5 10 16 20
Operation type   Handle/remote control/cab
Speed Hoist lifting m/min 8 ,8/0.8 8,8/0.8 7,7/0.7 3.5 3.5
Hoist travelling m/min 20 20 20 20 20
Crane travelling Handle 20 20 20 20 20
/remote control
cab 30,40 30,40 30,40 30,40 30,40
Electric hoist Type CD1/MD1 CD1/MD1 CD1/MD1 CD1 HC
Lifting height m 6,9
Work classifications   A5
Power   380V 50HZ 3phase AC
Span m 12,16,20,24,30

 


Application Scope of Single girder gantry crane


Single beam gantry crane is an important tool and equipment to realize mechanization and automation in modern industrial production and lifting transportation.Therefore, single-beam gantry cranes are widely used in indoor and outdoor industrial and mining enterprises, iron and steel chemicals, railway transportation, ports and wharves, logistics turnover and other departments and places.


Notes of Single girder gantry crane


(1) Each gantry crane shall hang a sign of rated lifting weight in a conspicuous place.


(2) During the work, no one may be transported on the bridge or by hook.


(3) No operation license and drunk are not allowed to drive gantry crane.


(4) During the operation must concentrate, do not talk, smoke or do irrelevant things.


(5) Clean the car;Do not leave equipment, tools, inflammable, explosive and dangerous goods.


(6) Overload is not allowed for gantry cranes.


(7) It shall not be hoisted under the following circumstances: the binding is not firm;Parts overload;Unknown signal;Suspension;Something buried or frozen in the ground;A person on a hanging object;Inflammable goods, explosive devices and dangerous goods without stable protection measures;An overfull liquid substance;The wire rope does not meet the requirements of protective use;The lifting mechanism is out of order.


(8) When the gantry crane is running on the line without obstacles, the hook or sling as well as the bottom surface of the hoisting object shall be more than 2m from the ground.If the obstacle is to be crossed, the obstacle must be more than 0.5m high.


(9) Allow two mechanisms to operate simultaneously for lifting objects less than half of the rated lifting weight;If the lifting weight is greater than half of the rated lifting weight, only one mechanism can be used.


(10) For bridge gantry cranes with main and secondary hooks, do not raise or lower the main and secondary hooks at the same time (special exceptions).


(11) Welding or hammering on the hoisted objects and working under the objects (if supported) shall not be permitted.


(12) Inspection or maintenance shall be carried out only after power failure and when a sign for power failure operation is hung on the switch.If live work is required, protective measures should be taken and persons should be assigned to take care of it.

 

Port Height 15M 7.5 Ton Single Girder Gantry Crane 0Port Height 15M 7.5 Ton Single Girder Gantry Crane 1Port Height 15M 7.5 Ton Single Girder Gantry Crane 2

 

 

Packing and shipping

 

Port Height 15M 7.5 Ton Single Girder Gantry Crane 3

 

 

 

You Might Be Into These
Get in touch with us

Enter Your Message

Zera@silenceindustry.com
+8619939936143
+86 19939936143
Silence-Zera
+86 19939936143
+86 19939936143